Project Migration Guide
1.8.0 Project Migration Guide
Migration from 1.7.X Project to 1.8.0 Project
Starting from version 1.8.0, Communication Component will only run as a background communication component of the vision system when Mech-Vision or Mech-Viz is launched. Specifically, Standard Interface communication and Adapter communication should be configured in Mech-Vision, while Master-Control communication should be configured in Mech-Viz.
Project Type (Divided According to the Communication Modes in Actual Use) |
Actions after Software Upgrade |
Standard Interface communication, Adapter communication |
Keep the same usage as 1.7.X version. |
Master-Control communication |
Reset configuration of Master-Control communication in Mech-Viz by following these steps:
|
For more notes after the upgrade, please refer to 1.8.0 Upgrade Notes.
Migration from 1.6.X Project to 1.8.0 Project
It is recommended to upgrade 1.6.X project to 1.7.X project first. For more detailed description, please refer to 1.7.0 Project Migration Guide.
Then you can upgrade 1.7.X project to 1.8.0 project. For more detailed description, please refer to Migration from 1.7.X Project to 1.8.0 Project.